[Federal Register Volume 64, Number 160 (Thursday, August 19, 1999)]
[Notices]
[Page 45252]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-21495]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Amendment of License and Soliciting Comments, Motions
To Intervene, and Protests
August 13, 1999.
Take notice that the following two hydroelectric applications have
been filed with the Commission and are available for public inspection:
a. Application Type: Non-Project Use of Lands and Waters.
b. Project No.: 1494-189, 1494-190, 1494-191, and 1494-193.
c. Date Filed: July 16, August 3, 1999 (1494-193).
d. Applicant: Grand River Dam Authority.
e. Name of Project: Pensacola.
f. Location: The Pensacola Project is located on the Grand (Neosho)
River in Craig, Delaware, Mayes, and Ottawa Counties, Oklahoma. This
project does not utilize Federal or Tribal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mary E. Von Drehle, Grand River Dam Authority
P.O. Box 409, Vinita, OK 74301 (918) 256-5545.
i. FERC Contact: Any questions on this notice should be addressed
to Jon Cofrancesco at Jon.C[email protected] or telephone 202-219-
0079.
j. Deadline for filing comments and or motions: September 20, 1999.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission,
Mail Code: DLC, HL-11.1, 888 First Street, NE, Washington, DC 20426.
Please include the project number (1494-189, 1494-190, 1494-191, or
1494-193 on any comments or motions filed.
k. Description of Project: 1494-189 Grand River Dam Authority,
licensee for the Pensacola Project, requests Commission authorization
to issue a permit to Charles King, d/b/a Belle View Resort, to add one
dock (32' x 90') containing 6 boat slips to an existing commercial
facility, containing two docks with a total of 7 boat slips. The
facility is located in Drowning Creek
1494-190 Grand River Dam Authority requests Commission
authorization to issue a permit to James Baker, d/b/a Wolf's Landing,
to add one dock (36' x 191') containing 13 boat slips to an existing
commercial facility containing one dock with 12 boat slips, a swim
dock, and two boat ramps. The facility is located in the upper end of
Duck Creek.
1494-191 Grand River Dam Authority requests Commission
authorization to issue a permit to Mack Magruder, d/b/a Hi-Lift Marina,
to enlarge an existing commercial facility currently containing 3
primary docks with a total of 31 boat slips and one boat ramp. Mr.
Magruder proposes to add 8 boat slips to an existing 7 boat slips and
add one dock (76' x 34') containing 6 boat slips. The proposed
additions would bring the total number of boat slips to 45. The
facility is located in Drowning Creek.
1494-193 Grand River Dam Authority requests Commission
authorization to issue a permit to Grand Lake Towne to add 10 boat
slips and 6 personal watercraft slips to an existing commercial
facility with two docks. The facility is located in Ketchum Cove.
l. Locations of the application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE, Room 2A, Washington,
DC 20426, or by calling (202) 208-1371. The application may be viewed
on the web at www.ferc.fed.us. Call (202) 208-2222 for assistance. A
copy is also available for inspection and reproduction at the address
in item h above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of rules of practice and procedure, 18 CFR 385.219, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Filing and Service of Responsive Documents--Any filings must bear
in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS FOR
TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. Any of the above-named documents must be filed
by providing the original and the number of copies provided by the
Commission's regulations to: The Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE, Washington, DC 20426. A copy of any
motion to intervene must also be served upon each representative of the
Applicant specified in the particular application.
Agency Comments--Federal, state, and local agencies are invited to
file comments on the desired application. A copy of the application may
be obtained by agencies directly from the Applicant. If an agency does
not file comments within the time specified for filing comments, it
will be presumed to have no comments. One copy of an agency's comments
must also be sent to the Applicant's representative.
Linwood A. Watson, Jr.
Acting Secretary.
[FR Doc. 99-21495 Filed 8-18-99; 8:45 am]
BILLING CODE 6717-01-M