[Federal Register Volume 64, Number 162 (Monday, August 23, 1999)] [Notices] [Pages 45984-45985] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-21731] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-277 and 50-278] PECO Energy Co.; Peach Bottom Atomic Power Station, Units 2 and 3; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License Nos. DRP-44 and DRP-56, issued to PECO Energy Company (the licensee), for operation of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located in York County, Pennsylvania. Environmental Assessment Identification of the Proposed Action The proposed action would correct existing editorial and typographical errors in the Technical Specification (TSs). Each proposed change has been verified to meet the intent of what was originally proposed by PECO Energy and approved by the NRC in previously processed amendments to the TSs. These changes are purely administrative and do not impact the operation of the facility. The proposed changes are summarized below. 1. Correct the labels for the Site Boundary and Exclusion Area Boundary on the Unit 2 and Unit 3 TS Figures 4.1-1 by reversing the labels. 2. Correct the note by replacing the word ``on'' with the word ``or'' in the Unit 3 TS Surveillance Requirement (SR) 3.3.1.2.5. 3. Correct the note above TS SR 3.8.4.1 by replacing ``SR 3.8.1.9'' with ``SR 3.8.4.9'' in the Unit 3 TS Section 3.8.4. The proposed action is in accordance with the licensee's application for amendment dated February 12, 1999, as supplemented by letter dated July 8, 1999. The Need for the Proposed Action When PBAPS Units 2 and 3, were converted to the Standard TSs under Amendments 210 and 214 respectively, Figure 4.1-1 of the TSs incorrectly reversed the depiction of the Site Boundary and the Exclusion Area Boundary. This mistake occurred during the licensee's conversion of the old TS Figure 3.8.1, ``Gaseous and Liquid Effluent Release Points,'' to the new TS Figure 4.1-1, ``Site and Exclusion Area Boundaries.'' To correct this error, the proposed TS Amendment is required to reflect that there is no change in the Exclusion Area or Site Boundaries and to correctly show that the Site Boundary resides outside of the Exclusion Area and outlines the area owned by the licensee related to PBABS Units 2 and 3. In PBAPS Unit 3 TS Surveillance Requirement SR 3.3.1.2.5, there is a note that reads, ``Not required to be performed until 12 hours after WRNMs indicate 125E-5% power on below.'' There is a typographical error in the note in that the note should read ``* * * power or below.'' In TS SR 3.8.4.1, there is a note that reads, ``SR through SR 3.8.4.8 are applicable only to the Unit 3 DC electrical power subsystems. SR 3.8.1.9 is applicable only to the Unit 2 DC electrical power subsystems.'' There is a typographical error in that SR 3.8.1.9 should read SR 3.8.4.9 which is being corrected by the licensee's amendment application. Environmental Impacts of the Proposed Action The Commission has completed its evaluation of the proposed action and concludes that the modifications to the Technical Specifications are administrative in nature. The proposed action will not increase the probability or consequences of accidents, no changes are being made in the types of any effluents that may be released off site, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action. With regard to potential non-radiological impacts, the proposed action does not involve any historic sites. It does not affect non- radiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action. Accordingly, the Commission concludes that there are no significant [[Page 45985]] environmental impacts associated with the proposed action. Alternatives to the Proposed Action As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the ``no-action'' alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar. Alternative Use of Resources This action does not involve the use of any resources not previously considered in the Final Environmental Statement for the Peach Bottom Atomic Power Station, Units 2 and 3. Agencies and Persons Consulted In accordance with its stated policy, on May 14, 1999, the staff consulted with the Pennsylvania State official, Mr. David Ney of the Department of Environmental Protection, regarding the environmental impact of the proposed action. The State official had no comments. Finding of No Significant Impact On the basis of the environmental assessment, the Commission concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the Commission has determined not to prepare an environmental impact statement for the proposed action. For further details with respect to the proposed action, see the licensee's letter dated February 12, 1999, as supplemented by letter dated July 8, 1999, which are available for public inspection at the Commission's Public Document Room, The Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the Government Publications Section, State Library of Pennsylvania, (Regional Depository) Education Building, Walnut Street and Commonwealth Avenue, Box 1601, Harrisburg, PA 17150. Dated at Rockville, MD, this 12th day of August 1999. For the Nuclear Regulatory Commission. Bartholomew C. Buckley, Sr., Project Manager, Section 2, Project Directorate I, Division of Licensing Project Management, Office of Nuclear Reactor Regulation. [FR Doc. 99-21731 Filed 8-20-99; 8:45 am] BILLING CODE 7590-01-P