[Federal Register Volume 64, Number 74 (Monday, April 19, 1999)]
[Notices]
[Pages 19146-19147]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-9650]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene and Protests

April 13, 1999.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: P-11691-000.
    c. Date Filed: March 5, 1999.
    d. Applicant: Universal Electric Power Corporation.
    e. Name of Project: Gainesville L & D.
    f. Location: On the Tombigbee River in Greene County, Alabama, 
utilizing federal lands administered by the U.S. Army Corps of 
Engineers.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)--825(r).
    h. Applicant Contact: Mr. Ronald S. Feltenberger, Universal 
Electric Power Corp., 1145 Highbrook Street, Akron, OH 44301, (330) 
535-7115.
    i. FERC Contact: Any questions on this notice should be addressed 
to Charles T. Raabe, E-mail address, Charles.R[email protected], or 
telephone (202) 219-2811.
    j. Deadline Date: 60 days from the issuance date of this notice.
    k. Description of Project: The proposed project would utilize the 
existing U.S. Army Corps of Engineers' Gainesville Lock and Dam and 
would consist of: (1) Seven new 50-foot-long, 96-inch-diameter steel 
penstocks; (2) a new 300-foot-long, 50-foot-wide, 40-foot-high 
powerhouse containing seven generating units with a total installed 
capacity of 23,200-kW; (3) a new exhaust apron; (4) a new 600-foot-
long, 14.7-kV transmission line; and (5) appurtenant facilities.
    Applicant estimates that the average annual generation would be 102 
GWh and that the cost of the studies to be performed under the terms of 
the permit would be $2,800,000. Project energy would be sold to utility 
companies, corporations, municipalities, aggregators, or similar 
entities.
    l. Locations of the application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE Washington, DC 20426, 
or by calling (202) 208-1371. This filing may be viewed on the web at 
http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for 
assistance). A copy

[[Page 19147]]

is also available for inspection and reproduction at the address in 
item h above.
    m. This notice also consists of the following standard paragraphs: 
A5, A7, A9, A10, B, C, and D2.
    A5. Preliminary Permit--Anyone desiring to file a competing 
application for preliminary permit for a proposed project must submit 
the competing application itself, or a notice of intent to file such an 
application, to the Commission on or before the specified comment date 
for the particular application (see 18 CFR 4.36). Submission of a 
timely notice of intent allows an interested person to file the 
competing preliminary permit application no later than 30 days after 
the specified comment date for the particular application. A competing 
preliminary permit application must conform with 18 CFR 4.30(b) and 
4.36.
    A7. Preliminary Permit--Any qualified development applicant 
desiring to file a competing development application must submit to the 
Commission, on or before a specified comment date for the particular 
application, either a competing development application or a notice of 
intent to file such an application. Submission of a timely notice of 
intent to file a development application allows an interested person to 
file the competing application no later than 120 days after the 
specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    A9. Notice of intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    A10. Proposed Scope of Studies under Permit--A preliminary permit, 
if issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    B. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, 
385.211, 385.214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    C. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT 
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'' ``PROTEST'', 
``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number 
of copies provided by the Commission's regulations to: The Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE, Washington, 
DC 20426. An additional copy must be sent to Director, Division of 
Project Review, Federal Energy Regulatory Commission, at the above-
mentioned address. A copy of any notice of intent, competing 
application or motion to intervene must also be served upon each 
representative of the Applicant specified in the particular 
application.
    D2. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-9650 Filed 4-16-99; 8:45 am]