[Federal Register Volume 65, Number 114 (Tuesday, June 13, 2000)]
[Notices]
[Pages 37127-37128]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 00-14842]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG00-159-000, et al.]


Front Range Power Company, LLC, et al.; Electric Rate and 
Corporate Regulation Filings

June 7, 2000.
    Take notice that the following filings have been made with the 
Commission:

1. Front Range Power Company, LLC,

[Docket No. EG00-159-000]

    Take notice that on June 5, 2000, Front Range Power Company, LLC, 
6647 Generation Drive, Fountain, Colorado 80817, filed with the Federal 
Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to part 365 of the Commission's 
regulations.
    Front Range Power Company, LLC is a Colorado limited liability 
company formed by Coastal Power Company (Coastal), a Delaware 
corporation and wholly owned affiliate of The Coastal Corporation and 
Colorado Springs Utilities (CSU), an enterprise of the City of Colorado 
Springs, Colorado, to develop, design, construct, own, operate and 
maintain a natural gas-fired combined-cycle electric generation plant 
with a maximum capacity of approximately 480 MW, located on a 23-acre 
parcel of land approximately 17 miles south of Colorado Springs, 
Colorado.
    Comment date: June 28, 2000, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

2. Southaven Power, LLC

[Docket No. EL00-81-000]

    Take notice that on June 1, 2000, Southaven Power, LLC (Southaven) 
filed a request for waiver of requirements under Order Nos. 888 and 
889, with respect to certain interconnection facilities associated with 
Southaven's generating facility to be located near Southaven, 
Mississippi.
    Comment date: July 3, 2000, in accordance with Standard Paragraph E 
at the end of this notice.

3. Allegheny Energy Service Corporation, on behalf of Monongahela 
Power Company, The Potomac Edison Company and West Penn Power 
Company (Allegheny Power)

[Docket No. ER00-1666-000]

    Take notice that on June 1, 2000, Allegheny Energy Service 
Corporation on behalf of Monongahela Power Company, The Potomac Edison 
Company and West Penn Power Company (Allegheny Power) filed a 
notification as directed by the Commission's Order in Docket No. ER00-
1666-000 on May 8, 2000 at 91 FERC para. 61,122, that it had adopted 
the revised North American Electric Reliability Council Transmission 
Loading Relief Procedures accepted for filing by that Order.
    Copies of the filing have been provided to jurisdictional 
customers, the Public Utilities Commission of Ohio, the Pennsylvania 
Public Utility Commission, the Maryland Public Service Commission, the 
Virginia State Corporation Commission, and the West Virginia Public 
Service Commission.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

4. Virginia Electric and Power Company

[Docket No. ER00-2671-000]

    Take notice that on June 1, 2000, Virginia Electric and Power 
Company (Virginia Power) tendered for filing the Service Agreement 
between Virginia Electric and Power Company and Associated Electric 
Cooperative, Inc. Under the Service Agreement, Virginia Power will 
provide services to Associated Electric Cooperative, Inc. under the 
terms of the Company's Revised Market-Based Rate Tariff designated as 
FERC Electric Tariff (Second Revised Volume No. 4), which was accepted 
by order of the Commission dated August 13, 1998 in Docket No. ER98-
3771-000.
    Virginia Power requests an effective date of June 1, 2000, the date 
of filing of the Service Agreement.
    Copies of the filing were served upon Associated Electric 
Cooperative, Inc., the Virginia State Corporation Commission and the 
North Carolina Utilities Commission.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

5. New England Power Pool

[Docket No. ER00-2672-000]

    Take notice that on June 1, 2000, the New England Power Pool 
(NEPOOL) Participants Committee filed a Service Agreement for Through 
or Out Service or In Service pursuant to Section 205 of the Federal 
Power Act and 18 CFR 35.12 of the Commission's regulations.
    Acceptance of this Service Agreement will recognize the provision 
of Long-Term Firm Out Service to Williams Energy Marketing &Trading 
Company, in conjunction with Regional Network Service, in accordance 
with the provisions of the NEPOOL Open Access Transmission Tariff filed 
with the Commission on December 31, 1996, as amended and supplemented.
    An effective date of July 1, 2000 for commencement of transmission 
service has been requested.
    Copies of this filing were sent to all NEPOOL members, the New 
England public utility commissioners and all parties to the 
transaction.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

6. New England Power Pool

[Docket No. ER00-2673-000]

    Take notice that on June 1, 2000, the New England Power Pool 
(NEPOOL) Participants Committee filed a Service Agreement for Through 
or Out Service or In Service pursuant to Section 205 of the Federal 
Power Act and 18 CFR 35.12 of the Commission's regulations.
    Acceptance of this Service Agreement will recognize the provision 
of Firm In Service transmission to PG&E Energy Trading--Power LP, in 
conjunction with Regional Network Service, in accordance with the 
provisions of the NEPOOL Open Access Transmission Tariff filed with the 
Commission on December 31, 1996, as amended and supplemented.
    An effective date of June 1, 2000 for commencement of transmission 
service has been requested.
    Copies of this filing were sent to all NEPOOL members, the New 
England public utility commissioners and all parties to the 
transaction.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

7. New England Power Pool

[Docket No. ER00-2674-000]

    Take notice that on June 1, 2000, the New England Power Pool 
(NEPOOL) Participants Committee filed for acceptance a signature page 
to the New England Power Pool Agreement dated September 1, 1971, as 
amended, signed by Mead Oxford Corporation (Mead Oxford). The NEPOOL 
Agreement has been designated NEPOOL FPC No. 2.
    The Participants Committee states that the Commission's acceptance 
of

[[Page 37128]]

Mead Oxford's signature page would permit NEPOOL to expand its 
membership to include Mead Oxford. The Participants Committee further 
states that the filed signature page does not change the NEPOOL 
Agreement in any manner, other than to make Mead Oxford a member in 
NEPOOL.
    The Participants Committee requests an effective date of August 1, 
2000, for commencement of participation in NEPOOL by Mead Oxford.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

8. New England Power Pool

[Docket No. ER00-2675-000]

    Take notice that on June 1, 2000, the New England Power Pool 
(NEPOOL) Participants Committee filed for acceptance a signature page 
to the New England Power Pool Agreement dated September 1, 1971, as 
amended, signed by the Energy Council of Rhode Island (TEC-RI). The 
NEPOOL Agreement has been designated NEPOOL FPC No. 2.
    The Participants Committee states that the Commission's acceptance 
of TEC-RI's signature page would permit NEPOOL to expand its membership 
to include TEC-RI. The Participants Committee further states that the 
filed signature page does not change the NEPOOL Agreement in any 
manner, other than to make TEC-RI a member in NEPOOL.
    The Participants Committee requests an effective date of June 1, 
2000, for commencement of participation in NEPOOL by TEC-RI.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

9. Panda Perkiomen Power, L.P.

[Docket No. ER00-2676-000]

    Take notice that on June 1, 2000, Panda Perkiomen Power, L.P. 
(Panda Perkiomen), tendered for filing pursuant to Rule 205, 18 CFR 
385.205, a petition for waivers and blanket approvals under various 
regulations of the Commission and for an order accepting its FERC 
Electric Rate Schedule No. 1, and for the purpose of permitting Panda 
Perkiomen to assign transmission capacity and to resell Firm 
Transmission Rights, to be effective no later than sixty (60) days from 
the date of its filing.
    Panda Perkiomen intends to engage in electric power and energy 
transactions as a marketer and a broker. In transactions where Panda 
Perkiomen sells electric energy, it proposes to make such sales on 
rates, terms, and conditions to be mutually agreed to with the 
purchasing party. Neither Panda Perkiomen nor any of its affiliates is 
in the business of transmitting or distributing electric power.
    Rate Schedule No. 1 provides for the sale of energy and capacity at 
agreed prices.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

10. American Ref-Fuel Company of Delaware Valley, L.P.

[Docket No. ER00-2677-000]

    Take notice that on June 1, 2000, American Ref-Fuel Company of 
Delaware Valley, L.P. (ARC), submitted for filing, pursuant to Section 
205 of the Federal Power Act, and Part 35 of the Commission's 
regulations (18 CFR Part 35), a Petition for authorization to make 
sales of electric capacity and energy at market-based rates and for 
related waivers and blanket authorizations.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

11. Indianapolis Power & Light Company

[Docket No. ER00-2678-000]

    Take notice that on June 1, 2000, Indianapolis Power & Light 
Company (IPL) tendered for filing blanket service agreements under 
IPL's Wholesale Power Sales Tariff. The Tariff was accepted for filing 
effective April 29, 2000 and has been designated as IPL's FERC Electric 
Tariff Revised Volume 2.
    IPL is requesting waiver of notice to permit the service agreements 
to be made effective May 17, 2000.
    A copy of the filing was served upon the parties to the service 
agreements.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

12. Indianapolis Power & Light Company

[Docket No. ER00-2680-000]

    Take notice that on June 1, 2000, Indianapolis Power & Light 
Company (IPL) tendered for filing unexecuted service agreements for 
service under IPL's Wholesale Power Sales Tariff. The Tariff was 
accepted for filing effective April 29, 2000 and has been designated as 
IPL's FERC Electric Tariff Revised Volume 2.
    IPL is requesting waiver of notice to permit the service agreements 
to be made effective June 1, 2000.
    A copy of the filing was served upon the parties to the service 
agreements.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

13. Ameren Services Company

[Docket No. ER00-2681-000]

    Take notice that on June 1, 2000, Ameren Services Company (AMS) 
tendered for filing an Interconnection Agreement between AMS and 
Reliant Energy Shelby County, LP (Reliant). AMS asserts that the 
purpose of the Agreement is to, among other things, establish the 
rights and obligations of Reliant, the point of interconnection and 
Corporate Guaranty.
    Comment date: June 22, 2000, in accordance with Standard Paragraph 
E at the end of this notice.

Standard Paragraph

    E. Any person desiring to be heard or to protest such filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in 
accordance with rules 211 and 214 of the Commission's rules of practice 
and procedure (18 CFR 385.211 and 385.214). All such motions or 
protests should be filed on or before the comment date. Protests will 
be considered by the Commission in determining the appropriate action 
to be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a motion to 
intervene. Copies of these filings are on file with the Commission and 
are available for public inspection. This filing may also be viewed on 
the Internet at http://www.ferc.fed.us/ online/rims.htm (call 202-208-
2222 for assistance).

David P. Boergers,
Secretary.
[FR Doc. 00-14842 Filed 6-12-00; 8:45 am]