NUCLEAR REGULATORY COMMISSION

[Docket No. 50-390]


Tennessee Valley Authority; Notice of Consideration of Issuance 
of Amendment to Facility Operating License and Opportunity for a 
Hearing

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering issuance of an amendment to Facility Operating License (OL) 
No. NPF-90, issued to the Tennessee Valley Authority (TVA, the 
licensee), for operation of the Watts Bar Nuclear Plant, Unit 1 (WBN), 
located in Rhea County, Tennessee.
    The proposed amendment would change the OL and Technical 
Specifications for WBN to reflect an increase in allowable thermal 
power to 3459 megawatts (thermal), an increase of approximately 1.4 
percent.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act) and the Commission's regulations.
    By October 10, 2000, the licensee may file a request for a hearing 
with respect to issuance of the amendment to the subject facility 
operating license and any person whose interest may be affected by this 
proceeding and who wishes to participate as a party in the proceeding 
must file a written request for a hearing and a petition for leave to 
intervene. Requests for a hearing and a petition for leave to intervene 
shall be filed in accordance with the Commission's ``Rules of Practice 
for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested 
persons should consult a current copy of 10 CFR 2.714 which is 
available at the Commission's Public Document Room, the Gelman 
Building, 2120 L Street, NW., Washington, DC, and accessible 
electronically through the ADAMS Public Electronic Reading Room link at 
the NRC Web 
site (http://www.nrc.gov). If a request for a hearing or petition for 
leave to intervene is filed by the above date, the Commission or an 
Atomic Safety and Licensing Board, designated by the Commission or by 
the Chairman of the Atomic Safety and Licensing Board Panel, will rule 
on the request and/or petition; and the Secretary or the designated 
Atomic Safety and Licensing Board will issue a notice of hearing or an 
appropriate order.
    As required by 10 CFR 2.714, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following factors: (1) The nature of the petitioner's right under the 
Act to be made a party to the proceeding; (2) the nature and extent of 
the petitioner's property, financial, or other interest in the 
proceeding; and (3) the possible effect of any order which may be 
entered in the proceeding on the petitioner's interest. The petition 
should also identify the specific aspect(s) of the subject matter of 
the proceeding as to which petitioner wishes to intervene. Any person 
who has filed a petition for leave to intervene or who has been 
admitted as a party may amend the petition without requesting leave of 
the Board up to 15 days prior to the first prehearing conference 
scheduled in the proceeding, but such an amended petition must satisfy 
the specificity requirements described above.
    Not later than 15 days prior to the first prehearing conference 
scheduled in the proceeding, a petitioner shall file a supplement to 
the petition to intervene which must include a list of the contentions 
which are sought to be litigated in the matter. Each contention must 
consist of a specific statement of the issue of law or fact to be 
raised or controverted. In addition, the petitioner shall provide a 
brief explanation of the bases of the contention and a concise 
statement of the alleged facts or expert opinion which support the 
contention

[[Page 54323]]

and on which the petitioner intends to rely in proving the contention 
at the hearing. The petitioner must also provide references to those 
specific sources and documents of which the petitioner is aware and on 
which the petitioner intends to rely to establish those facts or expert 
opinion. Petitioner must provide sufficient information to show that a 
genuine dispute exists with the applicant on a material issue of law or 
fact. Contentions shall be limited to matters within the scope of the 
amendment under consideration. The contention must be one which, if 
proven, would entitle the petitioner to relief. A petitioner who fails 
to file such a supplement which satisfies these requirements with 
respect to at least one contention will not be permitted to participate 
as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing, including the opportunity to present evidence and cross-
examine witnesses.
    A request for a hearing or a petition for leave to intervene must 
be filed with the Secretary of the Commission, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemakings and 
Adjudications Staff, or may be delivered to the Commission's Public 
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, 
by the above date. A copy of the petition should also be sent to the 
Office of the General Counsel, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, and to General Counsel, Tennessee Valley 
Authority, ET 10H, 400 East Summit Hill Drive, Knoxville, Tennessee 
37902, attorney for the licensee.
    Nontimely filings of petitions for leave to intervene, amended 
petitions, supplemental petitions and/or requests for hearing will not 
be entertained absent a determination by the Commission, the presiding 
officer or the presiding Atomic Safety and Licensing Board that the 
petition and/or request should be granted based upon a balancing of the 
factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
    If a request for a hearing is received, the Commission's staff may 
issue the amendment after it completes its technical review and prior 
to the completion of any required hearing if it publishes a further 
notice for public comment of its proposed finding of no significant 
hazards consideration in accordance with 10 CFR 50.91 and 50.92.
    For further details with respect to this action, see the 
application for amendment dated June 7, 2000, as supplemented June 23 
and August 24, 2000, which is available for public inspection at the 
Commission's Public Document Room, the Gelman Building, 2120 L Street, 
NW., Washington, DC, and accessible electronically through the ADAMS 
Public Electronic Reading Room link at the NRC Web site 
(http://www.nrc.gov).

    Dated at Rockville, Maryland, this 31st day of August 2000.

    For the Nuclear Regulatory Commission.
Robert E. Martin,
Senior Project Manager, Section 2, Project Directorate II-2, Division 
of Licensing Project Management, Office of Nuclear Reactor Regulation.