    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 11933-000.
    c. Date filed: March 30, 2001, supplemented May 9, 2001.
    d. Applicant: Bliss-Gooding Highway Hydropower, Inc.
    e. Name and Location of Project: The Bliss-Gooding Highway 
Hydropower Project would be located on the Malad River in Gooding 
County, Idaho. The project would not affect Federal or Tribal land.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    g. Applicant Contact: Mr. Silvio Coletti, Bliss-Gooding Highway 
Hydropower, Inc., 2727 South Merimac Place, Boise, ID 83709, (208) 562-
1527.
    h. FERC Contact: James Hunter, (202) 219-2839.
    i. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426. Comments, protests, and motions 
to intervene may be filed electronically via the internet in lieu of 
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's web site at http://www.ferc.fed.us/efi/doorbell.htm.
    Please include the project number (P-11933-000) on any comments or 
motions filed.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, it an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    j. Description of Project: The proposed project would consist of: 
(1) a 35-foot-high concrete dam; (2) a reservoir with a 75-acre surface 
area at normal elevation 3,420 feet; (3) an 800-foot-long, 10-foot-wide 
concrete canal; (4) an 800-foot-long, 5-foot-diameter steel penstock; 
(5) a powerhouse containing two 245-kilowatt generating units; (6) a 
tailrace returning flows to the Malad River at elevation 3,390 feet; 
(7) a one-quarter-mile-long, 600-volt transmission line; and (8) 
appurtenant facilities.
    k. A copy of the application is available for inspection and 
reproduction at the Commission's Public Reference Room, located at 888 
First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 
208-1371. The application may be viewed on http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for assistance). A copy is also 
available for inspection and reproduction at the address in item g 
above.
    l. Preliminary Permit--Any desiring to file a competing application 
for preliminary permit for a proposed project must submit the competing 
application itself, or a notice of intent to file such an application, 
to the Commission on or before the specified comment date for the 
particular application (see 18 CFR 4.36). Submission of a timely notice 
of intent allows an interested person to file the competing preliminary 
permit application no later than 30 days after the specified comment 
date for the particular application. A competing preliminary permit 
application must conform with 18 CFR 4.30(b) and 4.36.
    m. Preliminary Permit--Any qualified development applicant desiring 
to file a competing development application must submit to the 
Commission, on or before a specified comment date for the particular 
application, either a competing development application or a notice of 
intent to file such an application. Submission of a timely notice of 
intent to file a development application allows an interested person to 
file the competing application no later than 120 days after the 
specific comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    n. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such application may be filed, either a preliminary permit 
application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    o. Proposed Scope of Studies under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    p. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, 
385.211, 385.214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    q. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS,'' ``NOTICE OF INTENT 
TO FILE COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' 
``PROTEST,'' or ``MOTION TO INTERVENE,'' as applicable, and the Project 
Number of the particular application to which the filing refers.

[[Page 29117]]

Any of the above-named documents must be filed by providing the 
original and the number of copies provided by the Commission's 
regulations to: The Secretary, Federal Energy Regulatory Commission, 
888 First Street, NE, Washington, DC 20426. An additional copy must be 
sent to Director, Division of Hydropower Administration and Compliance, 
Federal Energy Regulatory Commission, at the above-mentioned address. A 
copy of any notice of intent, competing application or motion to 
intervene must also be serve upon each representative of the Applicant 
specified in the particular application.
    r. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Application. 
If an agency does not file comments within the time specified for 
filing comments, it will be presumed to have no comments. One copy of 
an agency's comments must also be sent to the Applicant's 
representatives.

David P. Boergers,
Secretary.
[FR Doc. 01-13364 Filed 5-25-01; 8:45 am]