[Federal Register Volume 72, Number 96 (Friday, May 18, 2007)]
[Rules and Regulations]
[Pages 27957-27972]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E7-9518]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[MD201-3117; FRL-8313-2]
Approval and Promulgation of Air Quality Implementation Plans;
Maryland; Update to Materials Incorporated by Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; Notice of administrative change.
-----------------------------------------------------------------------
SUMMARY: EPA is updating the materials submitted by Maryland that are
incorporated by reference (IBR) into the State implementation plan
(SIP). The regulations affected by this update have been previously
submitted by the Maryland Department of the Environment (MDE) and
approved by EPA. This update affects the SIP materials that are
available for public inspection at the National Archives and Records
Administration (NARA), the Air and Radiation Docket and Information
Center located at EPA Headquarters in Washington, DC, and the Regional
Office.
EFFECTIVE DATE: This action is effective May 18, 2007.
ADDRESSES: SIP materials which are incorporated by reference into 40
CFR part 52 are available for inspection at the following locations:
Air Protection Division, U.S. Environmental Protection Agency, Region
III, 1650 Arch Street, Philadelphia, Pennsylvania 19103; the Air and
Radiation Docket and Information Center, EPA Headquarters Library, Room
Number 3334, EPA West Building, 1301 Constitution Ave., NW.,
Washington, DC 20460, and the National Archives and Records
Administration. If you wish to obtain materials from a docket in the
EPA Headquarters Library, please call the Office of Air and Radiation
(OAR) Docket/Telephone number: (202) 566-1742; or the National Archives
and Records Administration (NARA). For information on the availability
of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
FOR FURTHER INFORMATION CONTACT: Harold A. Frankford, (215) 814-2108 or
by e-mail at [email protected].
SUPPLEMENTARY INFORMATION: The SIP is a living document which the State
revises as necessary to address the unique air pollution problems.
Therefore, EPA from time to time must take action on SIP revisions
containing new and/or revised regulations to make them part of the SIP.
On May 22, 1997 (62 FR 27968), EPA revised the procedures for
incorporating by reference Federally-approved SIPs, as a result of
consultations between EPA and the Office of the Federal Register (OFR).
The description of the revised SIP document, IBR procedures and
``Identification of plan'' format are discussed in further detail in
the May 22, 1997 Federal Register document. On November 29, 2004 (69 FR
69304), EPA published a document in the Federal Register beginning the
new IBR procedure for Maryland. On February 2, 2006 (72 FR 5607), EPA
published an update to the IBR material for Maryland. In this document,
EPA is doing the following:
1. Announcing the update to the IBR material as of March 15, 2007.
2. Making corrections to the following entries listed in the
paragraph 52.1070(c) chart, as described below:
a. COMAR 26.11.01.04--revising the text in the ``Additional
explanation/citation at 40 CFR Sec. 52.1100'' column by adding the SIP
effective date.
b. COMAR 26.11.09.01--revising the text in the ``Additional
explanation/citation at 40 CFR Sec. 52.1100'' column by correcting the
COMAR citation.
c. Technical Memorandum (TM) 91-01--This entry is revised to
reflect EPA's approval of revisions to this TM
[[Page 27958]]
document on September 7, 2001 (66 FR 46727).
3. Making corrections to the following entries listed in the
paragraph 52.1070(d) chart, as described below:
a. Entry for Potomac Electric Power Company (PEPCO)--Chalk Point--
amending the Federal Register citation for EPA's approval action.
b. Entry for Kaydon Ring and Seal, Inc.--revising the text in the
``Additional explanation'' column by removing the SIP effective date.
4. Making a correction to the paragraph 52.1070(e) chart by adding
an entry for the Mobile budgets associated with the 2005 Rate of
Progress plan for the Metropolitan Baltimore (1-hour) Ozone
Nonattaiment Area. The revised entry adds a date and Federal Register
citation, inadvertently omitted in the November 29, 2004 and February
2, 2006 Federal Register documents, on which EPA approved revisions to
these mobile budgets.
EPA has determined that today's rule falls under the ``good cause''
exemption in section 553(b)(3)(B) of the Administrative Procedures Act
(APA) which, upon finding ``good cause,'' authorizes agencies to
dispense with public participation, and section 553(d)(3) which allows
an agency to make a rule effective immediately (thereby avoiding the
30-day delayed effective date otherwise provided for in the APA).
Today's rule simply codifies provisions which are already in effect as
a matter of law in Federal and approved State programs. Under section
553 of the APA, an agency may find good cause where procedures are
``impractical, unnecessary, or contrary to the public interest.''
Public comment is ``unnecessary and contrary to the public interest''
since the codification only reflects existing law. Immediate notice in
the CFR benefits the public by removing outdated citations and
incorrect chart entries.
Statutory and Executive Order Reviews
A. General Requirements
Under Executive Order 12866 (58 FR 51735, October 4, 1993), this
action is not a ``significant regulatory action'' and therefore is not
subject to review by the Office of Management and Budget. For this
reason, this action is also not subject to Executive Order 13211,
``Actions Concerning Regulations That Significantly Affect Energy
Supply, Distribution, or Use'' (66 FR 28355, May 22, 2001). This action
merely approves state law as meeting Federal requirements and imposes
no additional requirements beyond those imposed by state law.
Accordingly, the Administrator certifies that this rule will not have a
significant economic impact on a substantial number of small entities
under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because
this rule approves pre-existing requirements under state law and does
not impose any additional enforceable duty beyond that required by
state law, it does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4). This rule also does not
have tribal implications because it will not have a substantial direct
effect on one or more Indian tribes, on the relationship between the
Federal Government and Indian tribes, or on the distribution of power
and responsibilities between the Federal Government and Indian tribes,
as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
This action also does not have Federalism implications because it does
not have substantial direct effects on the States, on the relationship
between the national government and the States, or on the distribution
of power and responsibilities among the various levels of government,
as specified in Executive Order 13132 (64 FR 43255, August 10, 1999).
This action merely approves a state rule implementing a Federal
standard, and does not alter the relationship or the distribution of
power and responsibilities established in the Clean Air Act. This rule
also is not subject to Executive Order 13045 ``Protection of Children
from Environmental Health Risks and Safety Risks'' (62 FR 19885, April
23, 1997), because it approves a state rule implementing a Federal
standard. In reviewing SIP submissions, EPA's role is to approve state
choices, provided that they meet the criteria of the Clean Air Act. In
this context, in the absence of a prior existing requirement for the
State to use voluntary consensus standards (VCS), EPA has no authority
to disapprove a SIP submission for failure to use VCS. It would thus be
inconsistent with applicable law for EPA, when it reviews a SIP
submission, to use VCS in place of a SIP submission that otherwise
satisfies the provisions of the Clean Air Act. Thus, the requirements
of section 12(d) of the National Technology Transfer and Advancement
Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not
impose an information collection burden under the provisions of the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
B. Submission to Congress and the Comptroller General
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this rule and other
required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. This rule is not a
``major rule'' as defined by 5 U.S.C. 804(2).
C. Petitions for Judicial Review
EPA has also determined that the provisions of section 307(b)(1) of
the Clean Air Act pertaining to petitions for judicial review are not
applicable to this action. Prior EPA rulemaking actions for each
individual component of the Maryland SIP compilations had previously
afforded interested parties the opportunity to file a petition for
judicial review in the United States Court of Appeals for the
appropriate circuit within 60 days of such rulemaking action. Thus, EPA
sees no need in this action to reopen the 60-day period for filing such
petitions for judicial review for this ``Identification of plan''
reorganization update action for Maryland.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: April 27, 2007.
Donald S. Welsh,
Regional Administrator, Region III.
0
40 CFR part 52 is amended as follows:
PART 52--[AMENDED]
0
1. The authority for citation for part 52 continues to read as follows:
Authority: 42.U.S.C. 7401 et seq.
Subpart V--Maryland
0
2. Section 52.1070 is amended by revising paragraphs (b), (c), (d), and
(e) to read as follows:
Sec. 52.1070 Identification of plan.
* * * * *
[[Page 27959]]
(b) Incorporation by reference. (1) Material listed as incorporated
by reference in paragraphs (c) and (d) was approved for incorporation
by reference by the Director of the Federal Register in accordance with
5 U.S.C. 552(a) and 1 CFR part 51. Material incorporated as it exists
on the date of the approval, and notice of any change in the material
will be published in the Federal Register. Entries in paragraphs (c)
and (d) of this section with EPA approval dates on or after March 15,
2007 will be incorporated by reference in the next update to the SIP
compilation.
(2) EPA Region III certifies that the rules/regulations provided by
EPA at the addresses in paragraph (b)(3) of this section are an exact
duplicate of the officially promulgated State rules/regulations which
have been approved as part of the State implementation plan as of March
15, 2007.
(3) Copies of the materials incorporated by reference may be
inspected at the EPA Region III Office at 1650 Arch Street,
Philadelphia, PA 19103; the EPA, Air and Radiation Docket and
Information Center, Room Number 3334, EPA West Building,
1301Constitution Avenue NW., Washington, DC 20460; or at the National
Archives and Records Administration (NARA). For information on the
availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
(c) EPA approved regulations.
EPA-Approved Regulations in the Maryland SIP
----------------------------------------------------------------------------------------------------------------
Additional
Code of Maryland State effective EPA approval explanation/citation
administrative regulations Title/subject date date at 40 CFR Sec.
(COMAR) citation 52.1100
----------------------------------------------------------------------------------------------------------------
26.11.01 General Administrative Provisions
----------------------------------------------------------------------------------------------------------------
26.11.01.01A., .01B Definitions.......... 10/10/01........ 5/28/02, 67 FR (c)(171); Additional
Exceptions: .01B(3), (13), 36810. EPA approvals are
(21) through (23), (25). codified at Sec.
Sec.
52.1100(c)(119),
(c)(122), (c)(143),
(c)(148), (c)(158),
(c)(159), and
(c)(164).
26.11.01.01B(53).............. Definitions--definiti 9/12/05......... 3/31/06, 71 FR Definition reflects
on of volatile 16239. the version of 40
organic compound CFR 51.100(s) in
(VOC). effect as of 12/31/
2004.
26.11.01.02................... Relationship of 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1).
Provisions in this 49651.
Subtitle.
26.11.01.03................... Delineation of Areas. 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1).
49651.
26.11.01.04................... Testing and 6/19/06......... 1/3/07, 72 FR 18 Paragraph .04C(2) is
Monitoring. added. The SIP
effective date is 3/
6/07.
26.11.01.05................... Records and 6/30/97, 12/10/ 5/28/02, 67 FR (c)(172).
Information. 01. 36810.
26.11.01.05-1................. Emission Statements.. 12/7/92......... 10/12/94, 59 FR (c)(109).
51517.
26.11.01.06................... Circumvention........ 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1).
49651.
26.11.01.07................... Malfunctions and 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(1).
Other Temporary 49651.
Increases in
Emissions.
26.11.01.08................... Determination of 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5).
Ground Level 49651.
Concentrations-
Acceptable
Techniques.
26.11.01.09................... Vapor Pressure of 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5).
Gasoline. 49651.
26.11.01.10................... Continuous Emission 7/22/91......... 2/28/96, 61 FR (c)(106); TM90-01 was
Monitoring (CEM) 7418. approved as
Requirements. ``additional
material'', but not
IBR'd.
----------------------------------------------------------------------------------------------------------------
26.11.02 Permits, Approvals, and Registration
----------------------------------------------------------------------------------------------------------------
26.11.02.01................... Definitions.......... 5/8/95.......... 2/27/03, 68 FR (c)(182); Exceptions:
9012. 26.11.02.01B(1), (1-
1), (4)-(6), (10),
(15), (16), (22),
(29)-(33), (37),
(39), (42), (46),
(49), (50), (54).
26.11.02.02................... General Provisions... 5/8/95.......... 2/27/03, 68 FR (c)(182); Exception:
9012. .02D.
26.11.02.03................... Federally Enforceable 5/8/95.......... 2/27/03, 68 FR (c)(182).
Permits to Construct 9012.
and State Permits to
Operate.
26.11.02.04................... Duration of Permits.. 5/8/95.......... 2/27/03, 68 FR (c)(182); Exception:
9012. .04C(2).
26.11.02.05................... Violation of Permits 5/8/95.......... 2/27/03, 68 FR (c)(182).
and Approvals. 9012.
26.11.02.06................... Denial of 5/8/95, 6/16/97. 2/27/03, 68 FR (c)(182).
Applications for 9012.
State Permits and
Approvals.
26.11.02.07................... Procedures for 5/8/95.......... 2/27/03, 68 FR (c)(182).
Denying, Revoking, 9012.
or Reopening and
Revising a Permit or
Approval.
[[Page 27960]]
26.11.02.08................... Late Applications and 5/8/95.......... 2/27/03, 68 FR (c)(182).
Delays in Acting on 9012.
Applications.
26.11.02.09................... Sources Subject to 5/8/95, 5/4/98.. 2/27/03, 68 FR (c)(182).
Permits to Construct 9012.
and Approvals.
26.11.02.10................... Sources Exempt from 5/8/95, 6/16/97, 2/27/03, 68 FR (c)(182).
Permits to Construct 9/22/97, 3/22/ 9012.
and Approvals. 99.
26.11.02.11................... Procedures for 5/8/95, 6/16/97. 2/27/03, 68 FR (c)(182); Exception:
Obtaining Permits to 9012. .11C.
Construct Certain
Significant Sources.
26.11.02.12................... Procedures for 5/8/95.......... 2/27/03, 68 FR (c)(182).
Obtaining Approvals 9012.
of PSD Sources and
NSR Sources, Permits
to Construct,
Permits to Construct
MACT Determinations
on a Case-by-Case
Basis in Accordance
with 40 CFR Part 63,
Subpart B, and
Certain 100-Ton
Sources.
26.11.02.13................... Sources subject to 5/8/95.......... 2/27/03, 68 FR (c)(182).
State Permits to 9012.
Operate.
26.11.02.14................... Procedures for 5/8/95, 6/16/97. 2/27/03, 68 FR (c)(182).
Obtaining State 9012.
Permits to Operate
and Permits to
Construct Certain
Sources and Permits
to Construct Control
Equipment on
Existing Sources.
----------------------------------------------------------------------------------------------------------------
26.11.04 Ambient Air Quality Standards
----------------------------------------------------------------------------------------------------------------
26.11.04.02................... State-Adopted 5/8/95.......... 8/20/01, 66 FR (c)(165).
National Ambient Air 43485.
Quality Standards.
26.11.04.03................... Definitions, 2/28/05......... 6/14/06, 71 FR .....................
Reference 34257.
Conditions, and
Methods of
Measurement.
26.11.04.04................... Particulate Matter... 2/28/05......... 6/14/06, 71 FR Addition of ambient
34257. air quality standard
for PM2.5.
26.11.04.05................... Sulfur Oxides........ 2/28/05......... 6/14/06, 71 FR .....................
34257.
26.11.04.06................... Carbon Monoxide...... 1/5/88; 4/7/93, 58 FR (c)(92).
recodified 8/1/ 18010.
88.
26.11.04.07................... Ozone................ 2/28/05......... 6/14/06, 71 FR Addition of an 8-hour
34257. ambient air quality
standard for ozone.
26.11.04.08................... Nitrogen Dioxide..... 2/28/05......... 6/14/06, 71 FR .....................
34257.
26.11.04.09................... Lead................. 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(3).
49651.
----------------------------------------------------------------------------------------------------------------
26.11.05 Air Quality Episode System
----------------------------------------------------------------------------------------------------------------
26.11.05.01................... Definitions.......... 6/18/90......... 4/14/94, 59 FR (c)(100).
17698.
26.11.05.02................... General Requirements. 6/18/90......... 4/14/94, 59 FR (c)(100).
17698.
26.11.05.03................... Air Pollution Episode 6/18/90......... 4/14/94, 59 FR (c)(100).
Criteria. 17698.
26.11.05.04................... Standby Emissions 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(4).
Reduction Plan. 49651.
26.11.05.05................... Control Requirements 6/18/90......... 4/14/94, 59 FR (c)(100).
and Standby Orders. 17698.
26.11.05.06................... Tables............... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(4).
49651.
----------------------------------------------------------------------------------------------------------------
26.11.06 General Emissions Standards, Prohibitions, and Restrictions
----------------------------------------------------------------------------------------------------------------
26.11.06.01................... Definitions.......... 5/8/91.......... 11/29/94, 59 FR (c)(102)(i)(B)(14).
60908.
26.11.06.02 [Except: Visible Emissions.... 11/11/02........ 8/6/03, 68 FR (c)(181).
.02A(1)(e), (1)(g), (1)(h), 46487.
(1)(i)].
26.11.06.03................... Particulate Matter... 11/11/02........ 86/03, 68 FR (c)(181).
46487.
[[Page 27961]]
26.11.06.04................... Carbon Monoxide in 1/5/88; 4/7/93, 58 FR (c)(92).
Areas III and IV. recodified 8/1/ 18010.
88.
26.11.06.05................... Sulfur Compounds from 11/11/02........ 8/6/03, 68 FR (c)(181).
Other than Fuel 46487.
Burning Equipment.
26.11.06.06................... Volatile Organic 9/22/97......... 5/7/01, 66 FR (c)(156). Note: On 2/
Compounds. 22924. 27/03 (68 FR 9012),
EPA approved a
revised rule
citation with a
State effective date
of 5/8/95
[(c)(182)(i)(C)].
26.11.06.10................... Refuse Burning 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5).
Prohibited in 49651.
Certain
Installations.
26.11.06.14................... Control of PSD 10/10/01........ 5/28/02, 67 FR (c)(171).
sources. 36810.
26.11.06.15................... Nitrogen Oxides from 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5).
Nitric Acid Plants. 49651.
26.11.06.16................... Tables............... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(5).
49651.
----------------------------------------------------------------------------------------------------------------
26.11.07 Open Fires
----------------------------------------------------------------------------------------------------------------
26.11.07.01................... Definitions.......... 5/22/95......... 6/11/02, 67 FR (c)(173).
39856.
26.11.07.02................... General.............. 5/22/95......... 2/25/97, 62 FR (c)(120).
8380.
26.11.07.03................... Control Officer May 8/11/97......... 6/11/02, 67 FR (c)(173).
Authorize Certain 39856.
Open Fires.
26.11.07.04................... Public Officers May 5/22/95......... 2/25/97, 62 FR (c)(120).
Authorize Certain 8380.
Fires.
26.11.07.05................... Open Fires Allowed 5/22/95......... 2/25/97, 62 FR (c)(120), .05A(3) &
Without 8380. (4), and .05B(3) are
Authorization of State-enforceable
Control Officer or only.
Public Officer.
26.11.07.06................... Safety Determinations 8/11/97......... 6/11/02, 67 FR (c)(173).
at Federal 39856.
Facilities.
----------------------------------------------------------------------------------------------------------------
10.18.08 Control of Incinerators
----------------------------------------------------------------------------------------------------------------
10.18.08.01................... Definitions.......... 3/25/84......... 7/2/85, 50 FR (c)(82).
27245.
10.18.08.02................... Applicability........ 7/18/80......... 8/5/81, 46 FR (c)(45).
39818.
10.18.08.03................... Prohibition of 6/8/81.......... 5/11/82, 47 FR (c)(58).
Certain Incinerators 20126.
in Areas III and IV.
10.18.08.04................... Visible Emissions.... 3/25/84......... 7/2/85, 50 FR (c)(82).
27245.
10.18.08.05................... Particulate Matter... 3/25/84......... 7/2/85, 50 FR (c)(82).
27245.
10.18.08.06................... Prohibition of 3/25/84......... 7/2/85, 50 FR (c)(82).
Unapproved Hazardous 27245.
Waste Incinerators.
----------------------------------------------------------------------------------------------------------------
26.11.09 Control of Fuel Burning Equipment and Stationary Internal Combustion Engines, and Certain Fuel-Burning
Installations
----------------------------------------------------------------------------------------------------------------
26.11.09.01................... Definitions.......... 9/12/05......... 6/13/06, 71 FR Revised definition of
34014. ``interruptible gas
service'' in
26.11.09.01B(4).
26.11.09.02................... Applicability........ 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(7).
49651.
26.11.09.03................... General Conditions 6/21/04......... 7/6/05, 70 FR Revised paragraphs
for Fuel Burning 38774. 26.11.09.03C(1) and
Equipment. .03C(2).
26.11.09.04................... Prohibition of 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(7).
Certain New Fuel 49651.
Burning Equipment.
26.11.09.05................... Visible Emissions.... 11/11/02........ 5/1/03, 68 FR (c)(183).
23206.
26.11.09.06................... Control of 6/21/04......... 7/6/05, 70 FR Addition of paragraph
Particulate Matter. 38774. 26.11.09.06C.
26.11.09.07................... Control of Sulfur 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(7).
Oxides from Fuel 49651.
Burning Equipment.
26.11.09.08................... Control of NOX 11/24/03........ 9/20/04, 69 FR (c)(191).
Emissions for Major 56170.
Stationary Sources.
26.11.09.09................... Tables and Diagrams.. 11/11/02........ 5/1/03, 68 FR (c)(183); Revised
23206. Table 1.
----------------------------------------------------------------------------------------------------------------
[[Page 27962]]
26.11.10 Control of Iron and Steel Production Installations
----------------------------------------------------------------------------------------------------------------
26.11.10.01................... Definitions.......... 12/25/00........ 11/7/01, 66 FR (c)(163).
56222.
26.11.10.02................... Applicability........ 11/2/98......... 9/7/01, 66 FR (c)(153).
46727.
26.11.10.03................... Visible Emissions.... 11/2/98......... 9/7/01, 66 FR (c)(153).
46727.
26.11.10.04................... Control of 11/2/98......... 9/7/01, 66 FR (c)(153).
Particulate Matter. 46727.
26.11.10.05................... Sulfur Content 11/2/98......... 9/7/01, 66 FR (c)(153).
Limitations for Coke 46727.
Oven Gas.
26.11.10.06[1]................ Control of Volatile 12/25/00........ 11/7/01, 66 FR (c)(163).
Organic Compounds 56222.
from Iron and Steel
Production
Installations.
26.11.10.06[2]................ Carbon Monoxide...... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(8).
49651.
26.11.10.07................... Testing and 12/25/00........ 11/7/01, 66 FR (c)(163).
Observation 56222.
Procedures.
----------------------------------------------------------------------------------------------------------------
26.11.11 Control of Petroleum Products Installations, Including Asphalt Paving, Asphalt Concrete Plants, and Use
of Waste Oils
----------------------------------------------------------------------------------------------------------------
26.11.11.01................... Applicability........ 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(9).
49651.
26.11.11.02................... Asphalt Paving....... 4/26/93......... 1/6/95, 60 FR (c)(113)(i)(B)(1).
2018.
26.11.11.03................... Asphalt Concrete 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(9).
Plants in Areas I, 49651.
II, V, and VI.
26.11.11.06................... Use of Waste Oils as 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(9).
Fuel. 49651.
----------------------------------------------------------------------------------------------------------------
26.11.12 Control of Batch Type Hot-Dip Galvanizing Installations
----------------------------------------------------------------------------------------------------------------
26.11.12.01................... Definitions.......... 5/8/95.......... 7/25/00, 64 FR (c)(149).
45743.
26.11.12.02................... Applicability........ 5/8/95.......... 7/25/00, 64 FR (c)(149).
45743.
26.11.12.03................... Prohibitions and 5/8/95.......... 7/25/00, 64 FR (c)(149).
Exemptions. 45743.
26.11.12.04................... Visible Emissions.... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(10).
49651.
26.11.12.05................... Particulate Matter... 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(10).
49651.
26.11.12.06................... Reporting 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(10).
Requirements. 49651.
----------------------------------------------------------------------------------------------------------------
26.11.13 Control of Gasoline and Other Volatile Organic Compound Storage and Handling
----------------------------------------------------------------------------------------------------------------
26.11.13.01................... Definitions.......... 8/11/97......... 12/22/98, 63 FR (c)(130).
70667.
26.11.13.02................... Applicability and 4/26/93......... 1/6/95, 60 FR (c)(113)(i)(B)(3).
Exemption. 2018.
26.11.13.03................... Large Storage Tanks.. 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(12).
49651.
26.11.13.04................... Loading Operations... 8/11/97......... 12/22/98, 63 FR (c)(132).
70667.
26.11.13.05................... Gasoline Leaks from 2/15/93......... 1/6/95, 60 FR (c)(112).
Tank Trucks. 2018.
26.11.13.06................... Plans for Compliance. 4/26/93......... 1/6/95, 60 FR (c)(113)(i)(B)(5).
2018.
26.11.13.07................... Control of VOC 1/21/02......... 6/29/04, 69 FR (c)(184).
Emissions from 38848.
Portable Fuel
Containers.
----------------------------------------------------------------------------------------------------------------
26.11.14 Control of Emissions from Kraft Pulp Mills
----------------------------------------------------------------------------------------------------------------
26.11.14.01................... Definitions.......... 1/8/01, 10/15/01 11/7/01, 66 FR (c)(170).
56220.
26.11.14.02................... Applicability........ 1/8/01.......... 11/7/01, 66 FR (c)(170).
56220.
[[Page 27963]]
26.11.14.06................... Control of Volatile 1/8/01, 10/15/01 11/7/01, 66 FR (c)(170).
Organic Compounds. 56220.
----------------------------------------------------------------------------------------------------------------
26.11.17 Requirements for Major New Sources and Modifications
----------------------------------------------------------------------------------------------------------------
26.11.17.01................... Definitions.......... 11/24/03........ 9/20/04, 69 FR 52.1070(c)(191).
56170.
26.11.17.02................... Applicability........ 4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(148).
9766.
26.11.17.03................... General Conditions... 4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(191).
9766.
26.11.17.04................... Baseline for 4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(148).
Determining Credit 9766.
for Emission and Air
Quality Offsets.
26.11.17.05................... Administrative 4/26/93, 10/2/00 2/12/01, 66 FR 52.1070(c)(148).
Procedures. 9766.
----------------------------------------------------------------------------------------------------------------
26.11.19 Volatile Organic Compounds from Specific Processes
----------------------------------------------------------------------------------------------------------------
26.11.19.01................... Definitions.......... 6/5/95.......... 9/2/97, 62 FR (c)(126). Note: On 5/
46199. 13/1998 (63 FR
26462), EPA approved
the revised
definition of
``major stationary
source of VOC'' with
a State effective
date of 5/8/1995
[(c)(128)].
26.11.19.02................... Applicability, 5/4/98, 12/10/01 2/3/03, 68 FR (c)(174), (c)(175).
Determining 5228. 1. Limited approval
Compliance, of paragraph .02G (9/
Reporting, and 4/98, 63 FR 47174)
General Requirements. [(c)(131)(
(c)(133)].
2. On 2/27/03 (68 FR
9012), EPA approved
a revised rule
citation with a
State effective date
of 5/8/95
[(c)(182)(i)(D)].
26.11.19.03................... Automotive and Light- 9/22/97......... 11/5/98, 63 FR (c)(140).
Duty Truck Coating. 59720.
26.11.19.04................... Can Coating.......... 8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12).
49651.
26.11.19.05................... Coil Coating......... 8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12).
49651.
26.11.19.06................... Large Appliance 8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12).
Coating. 49651.
26.11.19.07................... Paper, Fabric, Vinyl 8/24/98......... 1/14/2000, 64 FR (c)(147).
and Other Plastic 2334.
Parts Coating.
26.11.19.07-1................. Control of VOC 6/15/98......... 6/17/99, 64 FR (c)(142).
Emissions from solid 32415.
Resin Decorative
Surface
Manufacturing.
26.11.19.08................... Metal Furniture 8/1/88.......... 11/3/92, 57 FR (C)(90)(i)(B)(12).
Coating. 49651.
26.11.19.09................... Control of Volatile 6/5/95.......... 8/4/97, 62 FR (c)(123).
Organic Compounds 41853.
(VOC) Emissions from
cold and Vapor
Degreasing.
26.11.19.10................... Flexographic and 6/5/95.......... 9/2/97, 62 FR (c)(126).
Rotogravure Printing. 46199.
26.11.19.11................... Control of Volatile 6/5/95.......... 9/2/97, 62 FR (c)(126).
Organic Compounds 46199.
(VOC) Emissions from
Sheet-Fed and Web
Lithographic
Printing.
26.11.19.12................... Dry Cleaning 9/22/97......... 9/2/98, 63 FR (c)(131).
Installations. 46662.
26.11.19.13................... Miscellaneous Metal 5/8/91.......... 11/29/94, 59 FR (c)(102)(i)(B)(6).
Coating. 60908.
26.11.19.13-1................. Aerospace Coating 10/2/00, 10/15/ 11/7/01, 66 FR (c)(169).
Operations. 01. 56220.
26.11.19.13-2................. Control of VOC 8/24/98......... 6/17/99, 64 FR (c)(142).
Emissions from Brake 32415.
Shoe Coating
Operations.
26.11.19.13-3................. Control of VOC 6/29/98......... 6/17/99, 64 FR (c)(142).
Emissions from 32415.
Structural Steel
Coating Operations.
26.11.19.14................... Manufacture of 5/8/91.......... 11/29/94, 59 FR (c)(102)(i)(B)(14).
Synthesized 60908.
Pharmaceutical
Products.
[[Page 27964]]
26.11.19.15................... Paint, Resin, and 5/4/98, 3/22/99. 10/28/99, 64 FR (c)(145).
Adhesive 57989.
Manufacturing and
Adhesive Application.
26.11.19.16................... Control of VOC 8/19/91......... 9/7/94, 59 FR (c)(103)(i)(B)(9).
Equipment Leaks. 46180.
26.11.19.17................... Control of Volatile 9/12/05......... 3/31/06, 71 FR .....................
Organic Compounds 16237.
(VOC) Emissions from
Yeast Manufacturing.
26.11.19.18................... Control of Volatile 6/10/02......... 1/15/03, 68 FR (c)(177).
Organic Compounds 1972.
(VOC) Emissions from
Screen Printing and
Digital Imaging.
26.11.19.19................... Control of Volatile 10/2/00......... 5/7/01, 66 FR (c)(156).
Organic Compounds 22924.
(VOC) Emissions from
Expandable
Polystyrene
Operations.
26.11.19.21................... Control of Volatile 7/3/95.......... 10/15/97, 62 FR (c)(125)(i)(B)(4).
Organic Compounds 53544.
(VOC) Emissions from
Commercial Bakery
Ovens.
26.11.19.22................... Control of Volatile 8/11/97......... 9/23/99, 64 FR (c)(137).
Organic Compounds 41445.
(VOC) Emissions from
Vinegar Generators.
26.11.19.23................... Control of Volatile 5/22/95......... 8/4/97, 62 FR (c)(124).
Organic Compounds 41853.
(VOC) Emissions from
Vehicle Refinishing.
26.11.19.24................... Control of Volatile 8/11/97......... 9/23/99, 64 FR (c)(137).
Organic Compounds 41445.
(VOC) Emissions from
Leather Coating
Operations.
26.11.19.25................... Control of Volatile 8/11/97......... 1/26/99, 64 FR (c)(141).
Organic Compounds 3852.
from Explosives and
Propellant
Manufacturing.
26.11.19.26................... Control of Volatile 8/11/97......... 8/19/99, 64 FR (c)(139).
Organic Compound 45182.
Emissions from
Reinforced Plastic
Manufacturing.
26.11.19.27................... Control of Volatile 10/20/97........ 9/5/01, 66 FR (c)(166).
Organic Compounds 46379.
from Marine Vessel
Coating Operations.
26.11.19.28................... Control of Volatile 10/2/00......... 5/7/01, 66 FR (c)(157).
Organic Compounds 22924.
from Bread and Snack
Food Drying
Operations.
26.11.19.29................... Control of Volatile 10/2/00, 10/15/ 11/7/01, 66 FR (c)(160).
Organic Compounds 01. 56220.
from Distilled
Spirits Facilities.
26.11.19.30................... Control of Volatile 12/10/01, 11/11/ 6/3/03, 68 FR (c)(176).
Organic Compounds 02. 33000.
from Organic
Chemical Production
and
Polytetrafluoroethyl
ene Installations.
26.11.19.31................... Control of Volatile 6/5/06.......... 1/11/07, 72 FR .....................
Organic Compounds 1289.
from Medical Device
Manufacturing.
----------------------------------------------------------------------------------------------------------------
26.11.20 Mobile Sources
----------------------------------------------------------------------------------------------------------------
26.11.20.02................... Motor Vehicle 8/1/88.......... 11/3/92, 57 FR (c)(90)(i)(B)(13) [as
Emission Control 49651. 26.11.20.06].
Devices.
26.11.20.03................... Motor Vehicle Fuel 10/26/92........ 6/10/94, 59 FR (c)(101)(i)(B)(3).
Specifications. 29957.
26.11.20.04................... National Low Emission 3/22/99......... 12/28/99, 64 FR (c)(146).
Vehicle Program. 72564.
----------------------------------------------------------------------------------------------------------------
26.11.24 Stage II Vapor Recovery at Gasoline Dispensing Facilities
----------------------------------------------------------------------------------------------------------------
26.11.24.01................... Definitions.......... 4/15/02......... 5/7/03, 68 FR (c)(178).
24363.
26.11.24.01-1................. Incorporation by 4/15/02......... 5/7/03, 68 FR (c)(178).
Reference. 24363.
26.11.24.02................... Applicability, 4/15/02......... 5/7/03, 68 FR (c)(178).
Exemptions, and 24363.
Effective Date.
26.11.24.03................... General Requirements. 4/15/02......... 5/7/03, 68 FR (c)(178).
24363.
[[Page 27965]]
26.11.24.04................... Testing Requirements. 02/28/05........ 5/8/06, 71 FR .....................
26688.
26.11.24.05................... Inspection 2/15/93......... 6/9/94, 59 FR (c)(107).
Requirements. 29730.
26.11.24.06................... Training Requirements 2/15/93......... 6/9/94, 59 FR (c)(107).
for Operation and 29730.
Maintenance of
Approved Systems.
26.11.24.07................... Record-Keeping and 2/28/05......... 5/8/06, 71 FR .....................
Reporting 26688.
Requirements.
26.11.24.08................... Instructional Signs.. 2/15/93......... 6/9/94, 59 FR (c)(107).
29730.
26.11.24.09................... Sanctions............ 2/15/93......... 6/9/94, 59 FR (c)(107).
29730.
----------------------------------------------------------------------------------------------------------------
26.11.25 Control of Glass Melting Furnaces
----------------------------------------------------------------------------------------------------------------
26.11.25.01................... Definitions.......... 10/5/98......... 10/19/05, 70 FR .....................
60738.
26.11.25.02................... Applicability and 10/5/98......... 10/19/05, 70 FR .....................
Exemptions. 60738.
26.11.25.03................... Visible Emissions 10/5/98......... 10/19/05, 70 FR .....................
from Glass Melting 60738.
Furnaces.
26.11.25.04................... Particulate Matter 10/5/98......... 10/19/05, 70 FR .....................
Emissions from Glass 60738.
Melting Furnaces.
----------------------------------------------------------------------------------------------------------------
26.11.26 Conformity
----------------------------------------------------------------------------------------------------------------
26.11.26.01................... Definitions.......... 5/15/95, 6/5/95. 12/9/98, 63 FR (c)(136); definitions
67782. of Applicable
implementation plan,
Governor, State, and
State air agency.
26.11.26.03................... General Conformity... 5/15/95, 6/5/95. 12/9/98, 63 FR (c)(136); current
67782. COMAR citation is
26.11.26.04.
----------------------------------------------------------------------------------------------------------------
26.11.29 NOX Reduction and Trading Program
----------------------------------------------------------------------------------------------------------------
26.11.29.01................... Definitions.......... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
1866.
26.11.29.02................... Incorporation by 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
Reference. 1866.
26.11.29.03................... Scope and 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
Applicability. 1866.
26.11.29.04................... General Requirements 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
for Affected Trading 1866.
Sources.
26.11.29.05................... NOX Allowance 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
Allocations. 1866.
26.11.29.06................... Compliance Supplement 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
Pool. 1866.
26.11.29.07................... Allowance Banking.... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
1866.
26.11.29.08................... Emission Monitoring.. 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
1866.
26.11.29.09................... Requirements for New 11/24/03........ 3/22/04, 69 FR (c)(184)(i)(C)(1)-(5)
Sources and Set- 13236. .
Aside Pool.
26.11.29.10................... Reporting............ 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
1866.
26.11.29.11................... Record Keeping....... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
1866.
26.11.29.12................... End-of-Season 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
Reconciliation. 1866.
26.11.29.13................... Compliance 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
Certification. 1866.
26.11.29.14................... Penalties............ 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
1866.
26.11.29.15................... Requirements for 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(1).
Affected Nontrading 1866.
Sources.
----------------------------------------------------------------------------------------------------------------
26.11.30 Policies and Procedures Relating to Maryland's NOX Reduction and Trading Program
----------------------------------------------------------------------------------------------------------------
26.11.30.01................... Scope and 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
Applicability. 1866.
[[Page 27966]]
26.11.30.02................... Definitions.......... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
1866.
26.11.30.03................... Procedures Relating 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
to Compliance 1866.
Accounts and
Overdraft Accounts.
26.11.30.04................... Procedures Relating 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
to General Accounts. 1866.
26.11.30.05................... Allowance Banking.... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
1866.
26.11.30.06................... Allowance Transfers.. 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
1866.
26.11.30.07................... Early Reductions..... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
1866.
26.11.30.08................... Opt-In Procedures.... 5/1/00.......... 1/10/01, 66 FR (c)(154)(i)(B)(2).
1866.
26.11.30.09................... Allocation of 6/19/06......... 11/03/06, 71 FR New column for 2008
Allowances. 64647. allocations.
----------------------------------------------------------------------------------------------------------------
26.11.32 Control of Emissions of Volatile Organic Compounds from Consumer Products
----------------------------------------------------------------------------------------------------------------
26.11.32.01................... Applicability and 8/18/03......... 12/9/03, 68 FR (c)(185).
Exemptions. 68523.
26.11.32.02................... Incorporation by 8/18/03......... 12/9/03, 68 FR (c)(185).
Reference. 68523.
26.11.32.03................... Definitions.......... 8/18/03......... 12/9/03, 68 FR (c)(185).
68523.
26.11.32.04................... Standards(General.... 8/18/03......... 12/9/03, 68 FR (c)(185).
68523.
26.11.32.05................... Standards--Requiremen 8/18/03......... 12/9/03, 68 FR (c)(185).
ts for Charcoal 68523.
Lighter Materials.
26.11.32.06................... Standards--Requiremen 8/18/03......... 12/9/03, 68 FR (c)(185).
ts for Aerosol 68523.
Adhesives.
26.11.32.07................... Standards--Requiremen 8/18/03......... 12/9/03, 68 FR (c)(185).
ts for Floor Wax 68523.
Strippers.
26.11.32.08................... Innovative Products-- 8/18/03......... 12/9/03, 68 FR (c)(185).
CARB Exemption. 68523.
26.11.32.09................... Innovative Products-- 8/18/03......... 12/9/03, 68 FR (c)(185).
Department Exemption. 68523.
26.11.32.10................... Administrative 8/18/03......... 12/9/03, 68 FR (c)(185).
Requirements. 68523.
26.11.32.11................... Reporting 8/18/03......... 12/9/03, 68 FR (c)(185).
Requirements. 68523.
26.11.32.12................... Variances............ 8/18/03......... 12/9/03, 68 FR (c)(185).
68523.
26.11.32.13................... Test Methods......... 8/18/03......... 12/9/03, 68 FR (c)(185).
68523.
26.11.32.14................... Alternative Control 8/18/03......... 12/9/03, 68 FR (c)(185).
Plan (ACP). 68523.
26.11.32.15................... Approval of an ACP 8/18/03......... 12/9/03, 68 FR (c)(185).
Application. 68523.
26.11.32.16................... Record Keeping and 8/18/03......... 12/9/03, 68 FR (c)(185).
Availability of 68523.
Requested
Information.
26.11.32.17................... Violations........... 8/18/03......... 12/9/03, 68 FR (c)(185).
68523.
26.11.32.18................... Surplus Reductions 8/18/03......... 12/9/03, 68 FR (c)(185).
and Surplus Trading. 68523.
26.11.32.19................... Limited-Use Surplus 8/18/03......... 12/9/03, 68 FR (c)(185).
Reduction Credits 68523.
for Early
Reformulations of
ACP Products.
26.11.32.20................... Reconciliation of 8/18/03......... 12/9/03, 68 FR (c)(185).
Shortfalls. 68523.
26.11.32.21................... Modifications to an 8/18/03......... 12/9/03, 68 FR (c)(185).
ACP. 68523.
26.11.32.22................... Cancellation of an 8/18/03......... 12/9/03, 68 FR (c)(185).
ACP. 68523.
26.11.32.23................... Transfer of an ACP... 8/18/03......... 12/9/03, 68 FR (c)(185).
68523.
----------------------------------------------------------------------------------------------------------------
[[Page 27967]]
26.11.33 Architectural Coatings
----------------------------------------------------------------------------------------------------------------
26.11.33.01................... Applicability and 3/29/04......... 5/12/05, 70 FR .....................
Exemptions. 24979.
26.11.33.02................... Test Methods-- 3/29/04......... 5/12/05, 70 FR .....................
Incorporation by 24979.
Reference.
26.11.33.03................... Definitions.......... 3/29/04......... 5/12/05, 70 FR .....................
24979.
26.11.33.04................... General Standard--VOC 3/29/04......... 5/12/05, 70 FR .....................
Content Limits. 24979.
26.11.33.05................... VOC Content Limits... 3/29/04......... 5/12/05, 70 FR .....................
24979.
26.11.33.06................... Most Restrictive VOC 2/28/05......... 10/19/05, 70 FR Addition of sections
Limit. 60740. B(15) through B(19).
26.11.33.07................... Painting Restrictions 3/29/04......... 5/12/05, 70 FR .....................
24979.
26.11.33.08................... Thinning............. 3/29/04......... 5/12/05, 70 FR .....................
24979.
26.11.33.09................... Rust Preventive 3/29/04......... 5/12/05, 70 FR .....................
Coatings. 24979.
26.11.33.10................... Coatings Not Listed 2/28/05......... 10/19/05, 70 FR .....................
in Regulation .05. 60740.
26.11.33.11................... Lacquers............. 3/29/04......... 5/12/05, 70 FR .....................
24979.
26.11.33.12................... Container Labeling 2/28/05......... 10/19/05, 70 FR Deleted section K.
Requirements. 60740.
26.11.33.13................... Recordkeeping 2/28/05......... 10/19/05, 70 FR .....................
Requirements. 60740.
26.11.33.14................... Compliance Provisions 3/29/04......... 5/12/05, 70 FR .....................
and Test Methods. 24979.
----------------------------------------------------------------------------------------------------------------
11.14.08 Vehicle Emissions Inspection Program
----------------------------------------------------------------------------------------------------------------
11.14.08.01................... Title................ 1/02/95......... 10/29/99, 64 FR (c)(144).
58340.
11.14.08.02................... Definitions.......... 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144).
98. 58340.
11.14.08.03................... Applicability........ 6/10/02......... 1/16/03, 68 FR (c)(179).
2208.
11.14.08.04................... Exemptions........... 1/02/95......... 10/29/99, 64 FR (c)(144).
58340.
11.14.08.05................... Schedule of the 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144).
Program. 96. 58340.
11.14.08.06................... Certificates......... 6/10/02......... 1/16/03, 68 FR (c)(179).
2208.
11.14.08.07................... Extensions........... 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144).
98. 58340.
11.14.08.08................... Enforcement.......... 1/02/95......... 10/29/99, 64 FR (c)(144).
58340.
11.14.08.09................... Inspection Standards. 6/10/02......... 1/16/03, 68 FR (c)(179).
2208.
11.14.08.10................... General Requirements 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144).
for Inspection and 96, 10/19/98. 58340.
Preparation for
Inspection.
11.14.08.11................... Idle Exhaust 10/18/98........ 10/29/99, 64 FR (c)(144).
Emissions Test and 58340.
Equipment Checks.
11.14.08.11-1................. Transient Exhaust 12/16/96, 10/19/ 10/29/99, 64 FR (c)(144).
Emissions Test and 98. 58340.
Evaporative Purge
Test Sequence.
11.14.08.12................... Evaporative Integrity 6/10/02......... 1/16/03, 68 FR (c)(179).
Test, Gas Cap Leak 2208.
Test, and On-Board
Diagnostics
Interrogation
Procedures.
11.14.08.13................... Failed Vehicle and 1/02/95......... 10/29/99, 64 FR (c)(144).
Reinspection 58340.
Procedures.
11.14.08.14................... Dynamometer System 1/02/95......... 10/29/99, 64 FR (c)(144).
Specifications. 58340.
11.14.08.15................... Constant Volume 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144).
Sampler, Analysis 98. 58340.
System, and
Inspector Control
Specifications.
[[Page 27968]]
11.14.08.16................... Evaporative Test 6/10/02......... 1/16/03, 68 FR (c)(179).
Equipment, Gas Cap 2208.
Leak Test Equipment,
and on-Board
Diagnostics
Interrogation
Equipment
Specifications.
11.14.08.17................... Quality Assurance and 1/02/95......... 10/29/99, 64 FR (c)(144).
Maintenance--General 58340.
Requirements.
11.14.08.18................... Test Assurance 1/02/95......... 10/29/99, 64 FR (c)(144).
Procedures. 58340.
11.14.08.19................... Dynamometer Periodic 1/02/95......... 10/29/99, 64 FR (c)(144).
Quality Assurance 58340.
Checks.
11.14.08.20................... Constant Volume 1/02/95......... 10/29/99, 64 FR (c)(144).
Sampler Periodic 58340.
Quality Assurance
Checks.
11.14.08.21................... Analysis System 1/02/95......... 10/29/99, 64 FR (c)(144).
Periodic Quality 58340.
Assurance Checks.
11.14.08.22................... Evaporative Test 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144).
Equipment, Gas Cap 98. 58340.
Leak Test Equipment
and On-board
Diagnostics
Interrogation
Equipment Periodic
Quality Assurance
Checks.
11.14.08.23................... Overall System 1/02/95......... 10/29/99, 64 FR (c)(144).
Performance quality 58340.
Assurance.
11.14.08.24................... Control Charts....... 1/02/95......... 10/29/99, 64 FR (c)(144).
58340.
11.14.08.25................... Gas Specifications... 1/02/95......... 10/29/99, 64 FR (c)(144).
58340.
11.14.08.26................... Vehicle Emissions 1/02/95......... 10/29/99, 64 FR (c)(144).
Inspection Station. 58340.
11.14.08.27................... Technician's Vehicle 1/02//95, 10/19/ 10/29/99, 64 FR (c)(144).
Report. 98. 58340.
11.14.08.28................... Feedback Reports..... 1/02/95, 10/19/ 10/29/99, 64 FR (c)(144).
98. 58340.
11.14.08.29................... Certified Emissions 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144).
Technicians. 96. 58340.
11.14.08.30................... Certified Emissions 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144).
Repair Facility. 96. 58340.
11.14.08.31................... On-Highway Emissions 1/02/95......... 10/29/99, 64 FR (c)(144).
Test. 58340.
11.14.08.32................... Fleet Inspection 1/02/95, 12/16/ 10/29/99, 64 FR (c)(144).
Station. 96, 10/19/98. 58340.
11.14.08.33................... Fleet Inspection 1/02/95......... 10/29/99, 64 FR (c)(144).
Standards. 58340.
11.14.08.34................... Fleet Inspection and 1/02/95......... 10/29/99, 64 FR (c)(144).
Reinspection Methods. 58340.
11.14.08.35................... Fleet Equipment and 1/02/95......... 10/29/99, 64 FR (c)(144).
Quality Assurance 58340.
Requirements.
11.14.08.36................... Fleet Personnel 1/02/95......... 10/29/99, 64 FR (c)(144).
Requirements. 58340.
11.14.08.37................... Fleet Calibration Gas 1/02/95......... 10/29/99, 64 FR (c)(144).
Specifications and 58340.
Standard Reference
Materials.
11.14.08.38................... Fleet Record-Keeping 1/02/95......... 10/29/99, 64 FR (c)(144).
Requirements. 58340.
11.14.08.39................... Fleet Fees........... 1/02/95......... 10/29/99, 64 FR (c)(144).
58340.
11.14.08.40................... Fleet License 1/02/95......... 10/29/99, 64 FR (c)(144).
Suspension and 58340.
Revocation.
11.14.08.41................... Audits............... 1/02/95......... 10/29/99, 64 FR (c)(144).
58340.
11.14.08.42................... Fleet Inspection 1/02/95, 2/16/ 10/29/99, 64 FR (c)(144).
After 1998. 96, 10/19/98. 58340.
----------------------------------------------------------------------------------------------------------------
03.03.05 Motor Fuel Inspection
[Contingency SIP Measure]
----------------------------------------------------------------------------------------------------------------
03.03.05.01................... Definitions.......... 12/18/95........ 1/30/96, 61 FR (c)(101)(i)(B)(4);
2982. Approved as a
contingency SIP
measure as part of
the CO Maintenance
Plans for Baltimore
and DC. [(c)(117)
and (c)(118)].
[[Page 27969]]
03.03.05.01-1................. Standard 12/18/95........ 1/30/96, 61 FR .....................
Specifications for 2982.
Gasoline.
03.03.05.02-1................. Other Motor Vehicle 10/26/92........ 6/10/94, 58 FR .....................
Fuels. 29957.
03.03.05.05................... Labeling of Pumps.... 12/18/95........ 1/30/96, 61 FR .....................
2982.
03.03.05.08................... Samples and Test 10/26/92........ 6/10/94, 58 FR .....................
Tolerance. 29957.
03.03.05.15................... Commingled Products.. 10/26/92........ 6/10/94, 58 FR .....................
29957.
----------------------------------------------------------------------------------------------------------------
03.03.06 Emissions Control Compliance
[Contingency SIP Measure]
----------------------------------------------------------------------------------------------------------------
03.03.06.01................... Definitions.......... 12/18/95........ 1/30/96, 61 FR (c)(101)(i)(B)(5);
2982. Approved as a
contingency SIP
measure as part of
the CO Maintenance
Plans for Baltimore
and DC. [(c)(117)
and (c)(118)].
03.03.06.02................... Vapor Pressure 10/26/92........ 6/10/94, 58 FR .....................
Determination. 29957.
03.03.06.03................... Oxygen Content 12/18/95........ 1/30/96, 61 FR .....................
Determination. 2982.
03.03.06.04................... Registration......... 10/26/92........ 6/10/94, 58 FR .....................
29957.
03.03.06.05................... Recordkeeping........ 10/26/92........ 6/10/94, 58 FR .....................
29957.
03.03.06.06................... Transfer 12/18/95........ 1/30/96, 61 FR .....................
Documentation. 2982.
----------------------------------------------------------------------------------------------------------------
TM Technical Memoranda
----------------------------------------------------------------------------------------------------------------
TM81-04....................... Procedures for 5/1/81.......... 6/18/82, 47 FR (c)(67).
Observing and 26381.
Evaluating Visible
Emissions from
Stationary Sources.
TM83-05....................... Stack Test Methods 6/1/83.......... 2/23/85, 50 FR (c)(80).
for Stationary 7595.
Sources.
TM91-01 [Except Methods 1004A Test Methods and 11/2/98......... 9/7/01, 66 FR (c)(153)(i)(D)(5)
through E]. Equipment 46727. (Supplement 3 is
Specifications for added).
Stationary Sources.
----------------------------------------------------------------------------------------------------------------
(d) EPA approved state source-specific requirements.
----------------------------------------------------------------------------------------------------------------
State effective Additional
Name of source Permit No./type date EPA approval date explanation
----------------------------------------------------------------------------------------------------------------
(PEPCO)--Chalk Point Units 49352 1/27/78........... 4//2/79, 44 FR 52.1100(c) (22);
1 and 2. Amended Consent 19192. FRN republished 5/
Order. 3/79 (44 FR
25840).
Beall Jr./Sr. High School....... Consent Order..... 1/30/79........... 3/18/80, 45 FR 52.1100(c)(26).
17144.
Mt. Saint Mary's College........ Consent Order..... 3/8/79............ 3/18/80, 45 FR 52.1100(c)(26).
17144.
Potomac Electric Power Company Secretarial Order. 7/19/79........... 9/3/80, 45 FR 52.1100(c)(34).
(PEPCO)--Chalk Point. 58340.
Maryland Slag Co................ Consent Agreement 10/31/80.......... 9/8/81, 41 FR 52.1100(c)(49).
(Order). 44757.
Northeast Maryland Waste Secretarial Order. 11/20/81.......... 7/7/82, 47 FR 52.1100(c)(65)
Disposal Authority. 29531. (Wheelabrator-
Frye, Inc.).
Northeast Maryland Waste Secretarial Order. 2/25/83........... 8/24/83, 45 FR 52.1100(c)(70)
Disposal Authority and 55179. (Shutdown of
Wheelabrator-Frye, Inc. and the landfill for
Mayor and City Council of offsets).
Baltimore and BEDCO Development
Corp.
Westvaco Corp................... Consent Order..... 9/6/83, Rev. 1/26/ 12/20/84, 49 FR 52.1100(c)(74).
84. 49457.
Potomac Electric Power Company Administrative 9/13/99........... 12/15/00, 65 FR 52.1100(c)(151).
(PEPCO). Consent Order. 78416.
Thomas Manufacturing Corp....... Consent Decree.... 2/15/01........... 11/15/01, 66 FR 52.1100(c)(167).
57395.
[[Page 27970]]
Constellation Power Source Consent Order and 4/25/01........... 2/27/02, 67 FR 52.1100(c)(168).
Generation, Inc.--Brandon NOX RACT 8897.
Shores Units 1 & 2; Averaging Plan
Gould Street Unit 3; Proposal.
H.A. Wagner Units 1,
2, 3 & 4; C.P. Crane Units
1 & 3; and Riverside
Unit 4.
Kaydon Ring and Seal, Inc....... Consent Order..... 3/5/04............ 8/31/04, 69 FR (c)(190); SIP
53002. effective date is
11/1/04.
Perdue Farms, Inc............... Consent Order..... 2/1/05............ 1/11/07, 72 FR 52.1070(d)(1).
1291.
----------------------------------------------------------------------------------------------------------------
(e) EPA-approved nonregulatory and quasi-regulatory material.
----------------------------------------------------------------------------------------------------------------
Name of non-regulatory SIP Applicable State submittal Additional
revision geographic area date EPA approval date explanation
----------------------------------------------------------------------------------------------------------------
Base Year Emissions Inventory... Metropolitan 9/20/95........... 10/30/95, 60 FR 52.1075(a) CO.
Baltimore Ozone 55321.
Nonattainment
Area 1990.
1990 Base Year Emissions Metropolitan 3/21/94, 10/12/95. 1/30/96, 61 FR 52.1075(b), CO.
Inventory. Washington Ozone 2931.
Nonattainment
Area.
1990 Base Year Emissions All ozone 3/21/94........... 9/27/96, 61 FR 52.1075(c), VOC,
Inventory. nonattainment 50715. NOX, CO.
areas.
1990 Base Year Emissions Kent & Queen 3/21/94........... 4/23/97, 62 FR 52.1075(d), VOC,
Inventory. Anne's Counties. 19676. NOX, CO.
1990 Base Year Emissions Metropolitan 3/21/94........... 4/23/97, 62 FR 52.1075(e), VOC,
Inventory. Washington Ozone 19676. NOX, CO.
Nonattainment
Area.
1990 Base Year Emissions Metropolitan 12/24/97.......... 7/8/98, 63 FR 52.1075(f), VOC,
Inventory. Washington Ozone 36854. NOX.
Nonattainment
Area.
1990 Base Year Emissions Metropolitan 12/24/97.......... 2/3/00, 63 FR 5245 52.1075(g), VOC,
Inventory. Baltimore Ozone NOX.
Nonattainment
Area.
1990 Base Year Emissions Philadelphia- 12/24/97, 4/29/98, 2/3/00, 63 FR 5252 52.1075(h), VOC,
Inventory. Wilmington- 12/21/99, 12/28/ 9/19/01, 66 FR NOX.
Trenton Ozone 00. 44809.
Nonattainment
Area (Cecil
County).
15% Rate of Progress Plan...... Philadelphia- 7/12/95, 95-20. 40457.
Trenton Ozone
Nonattainment
Area (Cecil
County).
Stage II Vapor Recovery Western Maryland & 11/5/97........... 12/9/98, 63 FR 52.1076(b).
Comparability Plan. Eastern Shore 67780.
Counties.
15% Rate of Progress Plan....... Metropolitan 10/7/98........... 2/3/00, 65 FR 5245 52.1076(c).
Baltimore Ozone
Nonattainment
Area.
15% Rate of Progress Plan....... Metropolitan 5/5/98............ 7/19/00, 65 FR 52.1076(d).
Washington Ozone 44686.
Nonattainment
Area.
Post-1996 Rate of Progress Plan Philadelphia- 12/24/97, 4/24/98, 2/3/00, 63 FR 5252 52.1076(f).
& contingency measures. Wilmington- 8/18/98, 12/21/ 9/19/01, 66 FR 52.1076(f)(3).
Trenton Ozone 99, 12/28/00, 3/8/ 44809.
Nonattainment 04. 4/15/04, 69 FR
Area (Cecil 19939.
County).
Ozone Attainment Plan........... Philadelphia- 4/29/98, 8/18/98, 10/29/01, 66 FR 52.1076(h).
Wilmington- 12/21/99, 12/28/ 54578.
Trenton Ozone 00, 8/31/01.
Nonattainment
Area (Cecil
County).
9/2/03............ 10/27/03, 68 FR ..................
61103.
Transportation Conformity Philadelphia- 4/29/98, 8/18/98, 10/29/01, 66 FR 52.1076(i).
Budgets. Wilmington- 12/21/99, 12/28/ 54578.
Trenton Ozone 00.
Nonattainment
Area (Cecil
County).
Post-1996 Rate of Progress Plan Metropolitan 12/24/97, 4/24/98, 9/26/01, 66 FR 52.1076(j).
& contingency measures. Baltimore Ozone 8/18/98, 12/21/ 49108.
Nonattainment 99, 12/28/00.
Area.
Ozone Attainment Plan........... Metropolitan 4/29/98, 8/18/98, 10/30/01, 66 FR 52.1076(k).
Baltimore Ozone 12/21/99, 12/28/ 54666.
Nonattainment 00, 8/31/01.
Area.
9/2/03............ 10/27/03, 68 FR 52.1076(k).
61103.
[[Page 27971]]
Mobile budgets.................. Metropolitan 8/31/01........... 10/30/01, 66 FR 52.1076(l)
Baltimore Ozone 9/2/03............ 54666.
Nonattainment 10/27/03, 68 FR
Area. 61103.
Mobile budgets (2005)........... Metropolitan 9/2/03............ 10/27/03, 68 FR 52.1076(m).
Baltimore Ozone 61103.
Nonattainment
Area.
Piladelphia-
Wilmington-
Trenton Ozone
Nonattainment
Area (Cecil
County).
Mobile budgets (2005 Rate of Metropolitan 11/3/03........... 2/13/04, 69 FR 52.1076(n).
Progress Plan). Baltimore Ozone 7133.
Nonattainment
Area.
Extension for incorporation of All ozone 7/9/02............ 1/16/03, 68 FR 52.1078(b).
the on-board diagnostics (OBD) nonattainment 2208.
testing program into the areas.
Maryland I/M SIP.
Photochemical Assessment Metropolitan 3/24/94........... 9/11/95, 60 FR 52.1080.
Monitoring Stations (PAMS) Baltimore and 47081.
Program. Metropolitan
Washington Ozone
Nonattainment
Areas.
Consultation with Local All nonattainment 10/8/81........... 4/8/82, 47 FR 52.1100(c)(63).
Officials (CAA Sections 121 & & PSD areas. 15140.
127).
Lead (Pb) SIP................... City of Baltimore. 10/23/80.......... 2/23/82, 47 FR 52.1100(c)(60),
7835. (61).
TM90-01-``Continuous Statewide......... 9/18/91........... 2/28/96, 61 FR 52.1100(c)(106);
Emission Monitoring Policies 7418. approved into SIP
and Procedures''-October 1990. as ``additional
material'', but
not IBR'd.
Carbon Monoxide Maintenance Plan City of Baltimore-- 9/20/95........... 10/31/95, 60 FR 52.1100(c)(117).
Regional Planning 55321.
District 118.
.................. 7/15/04........... 04/04/05, 70 FR Revised Carbon
16958. Monoxide
Maintenance Plan
Base Year
Emissions
Inventory using
MOBILE6.
Carbon Monoxide Maintenance Plan Montgomery County 10/12/95.......... 1/30/96 61 FR 2931 52.1100(c)(118).
Election
Districts 4, 7,
and 13; Prince
Georges County
Election
Districts 2, 6,
16, 17 and 18.
3/3/04............ 04/04/05, 70 FR Revised Carbon
16958. Monoxide
Maintenance Plan
Base Year
Emissions
Inventory using
MOBILE6.
Ozone Maintenance Plan.......... Kent and Queen 2/4/04............ 10/21/04, 69 FR 52.1100(c)(187);
Anne's Counties. 61766. SIP effective
date is 11/22/04.
1996-1999 Rate-of-Progress Plan Washington DC 1- 12/20/97, 5/20/99. 5/16/05, 70 FR Only the TCMs in
SIP and the Transportation hour ozone 25688. Appendix H of the
Control Measures (TCMs) in nonattainment 5/20/1999
Appendix H. area. revision.
1999 motor vehicle
emissions budgets
of 128.5 tons per
day (tpy) of VOC
and 196.4 tpy of
NOX.
1990 Base Year Inventory Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR ..................
Revisions. hour ozone 25688.
nonattainment
area.
1999-2005 Rate-of-Progress Plan Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR Only the TCMs in
SIP Revision and the hour ozone 25688. Appendix J of the
Transportation Control Measures nonattainment 2/24/2004
(TCMs) in Appendix J. area. revision.
2002 motor vehicle
emissions budgets
(MVEBs) of 125.2
tons per day
(tpy) for VOC and
290.3 tpy of NOX,
and, 2005 MVEBs
of 97.4 tpy for
VOC and 234.7 tpy
of NOX.
[[Page 27972]]
VMT Offset SIP Revision......... Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR ..................
hour ozone 25688.
nonattainment
area.
Contingency Measure Plan........ Washington, DC 9/2/03, 2/24/04... 5/16/05, 70 FR ..................
Area. 25688.
1-hour Ozone Modeled Washington DC 1- 9/2/03, 2/24/04... 5/16/05, 70 FR
Demonstration of Attainment. hour ozone 25688.
nonattainment
area.
Attainment Demonstration and Washington County. 12/20/04, 2/28/05. 8/17/05, 70 FR
Early Action Plan for the 48283.
Washington County Ozone Early
Action Compact Area.
1-hour Ozone Attainment Plan.... Washington DC 1- 9/2/2003, 2/24/ 11/16/05, 70 FR
hour ozone 2004. 69440.
nonattainment
area.
8-hour Ozone Maintenance Plan Kent and Queen 05/2/06, 05/19/06. 12/22/06, 71 FR
for the Kent and Queen Anne's Anne's Counties. 76920.
Area.
----------------------------------------------------------------------------------------------------------------
[FR Doc. E7-9518 Filed 5-17-07; 8:45 am]
BILLING CODE 6560-50-P