DEPARTMENT OF JUSTICE
Notice of Lodging of Proposed Modifications of the Consent Decree
Entered in United States et al. v. Illinois Power Company and Dynegy
Midwest Generation
Notice is hereby given that on April 27, 2009, the United States
lodged Proposed Consent Decree Modifications in the United States
District Court for the Southern District of Illinois in the matter
captioned United States et al. v. Illinois Power Company and Dynegy
Midwest Generation, Inc. (Civil Action No. 99-833-MJR). These proposed
modifications were jointly agreed to by the United States, the State of
Illinois, the four citizen groups co-plaintiffs--the American Bottom
Conservancy, Health and Environmental Justice-St. Louis, Inc., Illinois
Stewardship Alliance, and
[[Page 23204]]
the Prairie Rivers Network--and Dynegy Midwest Generation (``DMG'').
The proposed modifications affect Section I of Appendix A,
Mitigation project Requirements, under which DMG is required to
complete installation of Advanced Truck Stop Electrification
(``ATSE''), preferably at State of Illinois-owned rest areas along
Illinois interstate highways in the St. Louis Metro-East area. In
accordance with this requirement, in 2006, DMG arranged for the
development of 81 electrification units at one facility in East St.
Louis, spending approximately $959,293 of the $1.5 million required
project dollars. Thereafter, DMG encountered difficulties implementing
a second ATSE project site and, in December, 2007, the Court extended
the deadline for completion of the ATSE project for one year (i.e.,
until December 31, 2008) in recognition of the difficulties in securing
a second truck stop location. By July, 2008, the Parties concluded
that, despite diligent efforts, DMG was unable to complete the ATSE
project, and thereafter agreed to seek modification of the Consent
Decree to provide for an alternative environmental mitigation project
to spend the balance of the project dollars. To this end, the Parties
have agreed to two related modifications to the Consent Decree. First,
the Parties have agreed that DMG may have until May 31, 2011 to
complete an approved mitigation project with the remaining $540,707.
Second, the Parties have agreed to require DMG to spend these funds to
retrofit diesel-powered, in-service, school bus and municipal vehicles
with technology to reduce emissions of PM, VOC and/or NOX.
This work will be facilitated by Illinois EPA, through that agency's
``Illinois Clean School Bus Program'' or the ``Illinois Clean Diesel
Grant Program,'' and will be aimed at eligible fleets in southwestern
Illinois. DMG's Baldwin Power Station is located in Randolph County,
and the intent of the Parties is to retrofit fleets to reduce emissions
as near to the plant as possible.
The Department of Justice will receive for a period of thirty (30)
days from the date of this publication comments relating to the above-
described Proposed Consent Decree Modification. Comments should be
addressed to the Assistant Attorney General, Environmental and Natural
Resources Division, and either e-mailed to [email protected] or mailed to P.O. Box 7611, U.S. Department of
Justice, Washington, DC 20044-7611, and should refer to United States
v. Illinois Power Company and Dynegy Midwest Generation, Inc., D.J.
Ref. No. 90-5-2-1-06837. During the public comment period, the proposed
modification to the Consent Decree may also be examined on the
following Department of Justice Web site: http://www.usdoj.gov/enrd/Consent_Decrees.html.
A copy of the proposed modification may also be obtained by mail
from the Consent Decree Library, P.O. Box 7611, U.S. Department of
Justice, Washington, DC 20044-7611 or by faxing or e-mailing a request
to Tonia Fleetwood ([email protected]), fax no. (202) 514-0097,
phone confirmation number (202) 514-1547. In requesting a copy from the
Consent Decree Library, please enclose a check in the amount of $4.00
(25 cents per page reproduction cost) payable to the U.S. Treasury.
Maureen Katz,
Assistant Chief, Environmental Enforcement Section, Environment and
Natural Resources Division.
[FR Doc. E9-11458 Filed 5-15-09; 8:45 am]
BILLING CODE 4410-15-P